![]() Port Washington Road and Green Tree Road detour will be utilized. Stage 4 - April/ May– Regent Road closed at intersection, Brown Deer Road closed, - Garden Center/ resident access from the East. Stage 3 – April – Regent Road closed at intersection, Brown Deer Road closed, - Garden Center/ resident access from the West. ![]() 2 lanes of traffic open on north side of roadway. Stage 2 – March - Regent Road closed at intersection, south side of Brown Deer Road closed. ![]() Stage 1 – January/ February – south side of Brown Deer Road closed. Below are the contractor proposed timelines for traffic control and detours during this project. Work on the MMSD Brown Deer Road project is scheduled to start January 2023. Below is the flyer with more information. There will be an opportunity to ask questions about the project. Learn more about the Brown Deer Road project. There will be a Public Open House at the Bayside Village Hall on Decemwith the meeting starting at 6:00pm. Please note that during the second stage of the project, Regent Road south of Brown Deer will be closed to traffic. Below are maps of the scheduled east bound Brown Deer Road closure for the two stages of the project and the detour that will be posted for east bound traffic. ![]() Please note that weather and ground conditions may affect the completion of the project. The MMSD Brown Deer Road project is scheduled to begin Januand run approximately 3 months. This closure and detour will be for the duration of the project which is anticipated to run until July 2023 The marked detour will start at the Brown Deer Road/Port Washington Road intersection and will direct traffic south on Port Washington Road, east on Green Tree Road to Lake Drive with the reverse traffic tracking Green Tree Road west to northbound Port Washington. Access to Regent Road north and south bound at Brown Deer Road will also be closed to traffic starting January 30 th. Starting January 30 th, Brown Deer Road will be closed to both directions of traffic from Regent Road to approximately the railroad trestle on the east end of the project. Construction closures will continue through the expected project completion in July 2023.Īt the request of the Bayside Village Manager, MMSD has reevaluated and modified the traffic control plan for the Brown Deer Road MMSD Project. Brown Deer Road will remain closed for this phase of the work. Residents on Regent Road will be required to use an alternate route such as Indian Creek Parkway to Seneca Road or Dean Road to Port Washington Road to access Brown Deer Road. This phase will include the closure of the southside of the intersection of Brown Deer Road and Regent Road and, as a result, Regent Road will be closed to through traffic at Brown Deer Road. The MMSD Brown Deer Rd sewer project will be beginning the next phase of the construction in early April 2023. MMSD Brown Deer Road - Revised project schedule Below is the latest schedule for the project. MMSD has updated the project schedule delaying the closing of the Regent Road/Brown Deer Road until April 12. Please use the link below to review the latest information. MMSD has updated the Brown Deer Road project.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |